Thermal Power Station-6

In 2006 JSC Irkutskenergo realized the project of joining of Thermal Power Station-6 branches and Bratsk Thermal Network (BTN) to the uniform thermal unit. Now Thermal Power Station-6 represents a powerful...
Director Konoplev Sergey Ivanovich First Deputy Director – Technical Director Berlin Vitaly Moiseevich Technical Director for the Segment of Thermal Sources and Thermal Network Bryukhnov Anatoly Vasilievich...
Central Site Thermal Power Station-6 was designed and was started to be constructed as a part of Bratsk Timber Industry Complex. In 1965, after start-up of the first boiler and first turbine, the thermal...
Central Segment In 2004-2005, at Thermal Power Station-6, at the boiler units №3 and №1, the team of TPS-6 developed and successfully started up the system of emergency regulation of BKZ-320-140 PT boiler...
Thermal Power Station-6 Address: Bratsk-18, Irkutsk area 665718, POB 428 (395-3) 49-13-61 Phone number: (395-3) 43-80-37 (Reception) Fax number: (395-3) 323-957 Email: all@tec6.irkutskenergo.ru Contact...